photo: Rail Baltica/RB Rail AS Announces a New Public Tender for the Design Services for the New Line Through Kaunas Urban Node
Rail Baltica Global project coordinator and joint venture RB Rail AS announced a new public tender for the master design, detailed technical design, and design supervision (author supervision) services for the construction of the new Rail Baltica line through Kaunas Urban Node. The contract with the design service provider will be signed jointly by RB Rail AS and LTG Infra. All interested suppliers can submit their applications by 16 January 2023.
“Kaunas Urban will have an essential role in the Rail Baltica railway line. It is one of the most important transport hubs both in Lithuania and the whole Baltic region as this is where routes between Northern, Western, and Central Europe will meet. It is therefore important that the infrastructure solutions guarantee a basis for smooth connectivity and efficient use of the Rail Baltica corridor,” emphasized Irmantas Butkauskas, Head of the Lithuanian branch at RB Rail AS.
Read more
Alstom, a global leader in intelligent and sustainable mobility, participates in Rail Live! 2022, held in Malaga today, on 30th November, and 1st…
„While implementing the Rail Baltica project we are following the tactic to prepare for the next phase of the project in advance. Spatial planning on Kaunas Urban Node is underway. The announcement of the procurement of design services will provide an opportunity to move to the next phase of the project implementation as smoothly as possible once the special plan will be approved,” says Dovydas Palaima, General Manager at LTG Infra Rail Baltica Management.
Rail Baltica Kaunas Urban Node consists of ~83 km high-speed railway mainline and ~ 27 km combined railway track length of railway infrastructure facilities and freight yard. It also includes 10 road structures, such as bridges, viaducts, culverts, wildlife crossings, and other necessary infrastructure elements. Infrastructure components, railway operation parameters, and quantities provided are at this stage preliminary, and more detailed information will be provided during the second stage of this procurement.
Read more
The Board of Directors has appointed Lucius Gerig (35) as the new Head of Division Switzerland and a member of Stadler Group's Executive Board with…
Trains on the Rail Baltica railway line are expected to travel up to 249 km/h. The aim is to remove the present missing link of the EU track gauge connection between the Baltic states with the rest of the North Sea-Baltic core network corridor and significantly increase the connections between the main cities along the corridor, efficient synergies with the existing rail network in the Baltics and ensure multimodal connections to roads, ports, and airports.
Currently, more than 640 km of Rail Baltica main line in the Baltic states are being designed and this procurement is another major step forward to implementing the design of the whole 870 km line in the Baltics. The Kaunas – Vilnius section and route from Jiesia (Kaunas) to the Lithuania border with Poland design procurements have been already launched.
Read more
As of December 11, a new Kraków-Vilnius-Krakow connection will appear in the PKP Intercity timetable, allowing travel between Poland and Lithuania…
Source: Rail Baltica Press Releases