Alstom signed a contract for the 700-meter double-track expansion of the VLT (tramway) system in Rio de Janeiro, which will offer an integrated terminal connection to a new Bus Rapid Transit (BRT) system and interconnection with the bus station in the city. The scope of the project includes the extension of the VLT system…